IDOT announces multiple I-55 construction projects

Local News
Road construction_1510865286323.jpg

The Illinois Department of Transportation is advising travelers that a series of construction projects along Interstate 55 through Grundy, Livingston and McLean counties will potentially cause backups and delays, particularly on weekends, for the next several weeks.

The projects involve bridge rehabilitations, pavement repairs and patching, which will require permanent and intermittent lane closures in several locations:

• Resurfacing between mile markers 201 and 205. Traffic currently reduced to one lane in each direction. Recommended alternative route of Illinois 116 in Pontiac, Illinois 23, Old U.S. 66 and County Highway 1 in Odell
• Resurfacing between mile markers 195 and 201. Recommended alternative route of utilizing Old U.S. 66 from exits at U.S. 24, Illinois 116, Illinois 23 and County Highway 1
• Bridge repairs at mile markers 221 and 189
• Intermittent patching repairs between mile markers 209 to 233

Backups are anticipated during heavier travel periods, especially on Fridays and Sundays.

Motorists can expect delays and should allow extra time for trips through this area. 

Copyright 2021 Nexstar Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Latest Local News

More Local News